Failure analysis of primary waste heat boiler tube in ammonia plant

Volume: 7, Issue: 2, Pages: e06151 - e06151
Published: Feb 1, 2021
Abstract
The primary Waste Heat Boiler (WHB) in an ammonia plant experienced cap leaking and the outer tube rupture after ten months since the last repair and replacement (total retubing). The leaking cap and the outer tube materials are low carbon steel SA-204 Gr. B and SA-209 Gr. T1a. The inappropriate vertical part of the leaked cap, which is 2.4 mm shorter than the design, might trigger turbulence flow inside the cap and lead to flow-accelerated...
Paper Details
Title
Failure analysis of primary waste heat boiler tube in ammonia plant
Published Date
Feb 1, 2021
Journal
Volume
7
Issue
2
Pages
e06151 - e06151
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.