Cost and performance of CSP and PV plants of capacity above 100 MW operating in the United States of America

Volume: 39, Pages: 90 - 98
Published: Dec 1, 2021
Abstract
• CSP and PV not competitive but complementary technologies. • PV is cheaper at about 3 c/kWh but only available daytime. • CSP with TES more expensive at about 6 c/kWh but fully dispatchable. • CSP with TES less expensive than PV with batteries. • Synergy is needed coupling CSP with TES, PV, and batteries. This work aims to compare the cost and performance of Photovoltaic (PV) and Concentrated Solar Power (CSP) solar plants utility-size >100 MW...
Paper Details
Title
Cost and performance of CSP and PV plants of capacity above 100 MW operating in the United States of America
Published Date
Dec 1, 2021
Volume
39
Pages
90 - 98
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.