Optimizing the prefabrication finishing level in modular construction

Volume: 48, Issue: 11, Pages: 1534 - 1540
Published: Nov 1, 2021
Abstract
Prefabricated modules in modular construction projects can have a wide range of finishing levels that range from partially completed with only structural frame to fully completed with all structural, wall, mechanical, electrical, finishing and furnishing components. A higher module finishing level increases the offsite fabrication and transportation cost and decreases onsite assembly cost and duration while a lower finishing level produces the...
Paper Details
Title
Optimizing the prefabrication finishing level in modular construction
Published Date
Nov 1, 2021
Volume
48
Issue
11
Pages
1534 - 1540
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.