Recovery Technology of Bottom Coal in the Gob-Side Entry of Thick Coal Seam Based on Floor Heave Induced by Narrow Coal Pillar

Volume: 13, Issue: 13, Pages: 3368 - 3368
Published: Jul 1, 2020
Abstract
To improve the resource recovery efficiency of mining face in thick coal seams, the correlation between deformation failure of bottom coal in the gob-side entry and coal pillar width was analyzed by theoretical analysis, numerical calculation, and similar simulation experiments. The results showed that, when the coal pillar was strong, with the decrease of pillar width, the failure depth of the bottom coal in the gob-side entry and floor heave...
Paper Details
Title
Recovery Technology of Bottom Coal in the Gob-Side Entry of Thick Coal Seam Based on Floor Heave Induced by Narrow Coal Pillar
Published Date
Jul 1, 2020
Journal
Volume
13
Issue
13
Pages
3368 - 3368
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.