Simulation and optimization of a combined cycle gas turbine power plant for part-load operation

Volume: 131, Pages: 29 - 40
Published: Mar 1, 2018
Abstract
Combined cycle gas turbine (CCGT) power plants must often run at part-load conditions, as the electricity demand varies constantly. We present a method and necessary correlations for simulating the part-load operation of a typical CCGT plant in a commercial simulator (e.g. GateCycle). We show that assuming constant values for some equipment parameters (e.g. efficiencies) and ignoring the operating maps of key equipment can overestimate plant...
Paper Details
Title
Simulation and optimization of a combined cycle gas turbine power plant for part-load operation
Published Date
Mar 1, 2018
Volume
131
Pages
29 - 40
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.