Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel

Volume: 4, Issue: 4, Pages: 287 - 297
Published: Nov 27, 2009
Abstract
Nowsood water conveyance tunnel is 49 km long and has been designed for transferring 70 m3/s water from Sirvan river southward to Dashte Zahab plain in the west of Iran. This long tunnel has been divided into three sections, namely 1A, 1B and 2. By April 2008, about 5.3 km of the lot 2 of this project, with a total length of 26 km, were excavated by a double-shield TBM. The bored section of tunnel passed through different geological units of...
Paper Details
Title
Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel
Published Date
Nov 27, 2009
Volume
4
Issue
4
Pages
287 - 297
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.