A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin

Volume: 1, Issue: 2, Pages: 205 - 209
Published: Dec 1, 2014
Abstract
A multi-lateral horizontal well is one of the main well types employed in the coal bed methane (CBM) development. In a traditional CBM multi-lateral horizontal well, either a major hole or laterals will go crossing through coal beds to the largest extent, which may eventually result in bed collapse, footage failing to meet the design requirement, and the major hole unable to be monitored, re-entered and flushed. Therefore, this paper puts...
Paper Details
Title
A new attempt of a CBM tree-like horizontal well: A pilot case of Well ZS 1P-5H in the Qinshui Basin
Published Date
Dec 1, 2014
Volume
1
Issue
2
Pages
205 - 209
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.