An opportunistic prediction-based thread scheduling to maximize throughput/watt in AMPs

Pages: 63 - 72
Published: Oct 7, 2013
Abstract
The importance of dynamic thread scheduling is increasing with the emergence of Asymmetric Multicore Processors (AMPs). Since the computing needs of a thread often vary during its execution, a fixed thread-to-core assignment is sub-optimal. Reassigning threads to cores (thread swapping) when the threads start a new phase with different computational needs, can significantly improve the energy efficiency of AMPs. Although identifying phase...
Paper Details
Title
An opportunistic prediction-based thread scheduling to maximize throughput/watt in AMPs
Published Date
Oct 7, 2013
Pages
63 - 72
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.