Revised Corrosion Management With Reliability Based Excavation Criteria

Published: Jan 1, 2008
Abstract
For decades, TransCanada Pipelines has used inline inspection (ILI) to manage the threat of corrosion on gas pipelines. Immediate integrity was addressed using rupture pressure ratio and leak criteria, and future integrity was addressed using a growth assessment. However, a review of excavations based on predictions of defect growth shows that few excavations actually lead to repairs. This study investigated the areas of undue conservatism in...
Paper Details
Title
Revised Corrosion Management With Reliability Based Excavation Criteria
Published Date
Jan 1, 2008
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.