Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station

Volume: 124, Pages: 98 - 108
Published: Jan 1, 2012
Abstract
Two headrace tunnels and the drainage tunnel were excavated by tunnel boring machines (TBMs) in Jinping II Hydropower Station. During TBM excavation, two types of slabbing failure were encountered in these deep buried marble tunnels. One is rock bursting and the other is non-violent slabbing. In order to study the rock burst and slabbing failure, a unique true triaxial rock burst test was carried out to simulate the rock burst process with...
Paper Details
Title
Rock burst and slabbing failure and its influence on TBM excavation at headrace tunnels in Jinping II hydropower station
Published Date
Jan 1, 2012
Volume
124
Pages
98 - 108
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.