Analysis on the Rock–Cutter Interaction Mechanism During the TBM Tunneling Process

Volume: 49, Issue: 3, Pages: 1073 - 1090
Published: Jul 21, 2015
Abstract
The accurate prediction of rock cutting forces of disc cutters is crucial for tunnel boring machine (TBM) design and construction. Disc cutter wear, which affects TBM penetration performance, has frequently been found at TBM sites. By considering the operating path and wear of the disc cutter, a new model is proposed for evaluating the cutting force and wear of the disc cutter in the tunneling process. The circular path adopted herein, which is...
Paper Details
Title
Analysis on the Rock–Cutter Interaction Mechanism During the TBM Tunneling Process
Published Date
Jul 21, 2015
Volume
49
Issue
3
Pages
1073 - 1090
Citation AnalysisPro
  • Scinapse’s Top 10 Citation Journals & Affiliations graph reveals the quality and authenticity of citations received by a paper.
  • Discover whether citations have been inflated due to self-citations, or if citations include institutional bias.